Manufacturing Process

Twelve stages from spec
to your warehouse.

From forging a knife billet or laser-cutting a blank through hollow grinding, vacuum heat treatment (quenching and tempering), and knife sharpening on water-cooled stones to a verified BESS edge, this is the actual knife making production flow your order goes through, with the typical time and tolerance at each stage.

12-stage production flow

Every order takes the
same twelve steps.

01 / Design

Spec & Sample

Sketch, photo, sample. We confirm geometry, steel, handle, MOQ, target FOB. NDA signed if needed.

02 / Tooling

Prototype

3D model, laser-cut blank, hand-ground prototype. Photos and HRC report. 12-18 days.

03 / Cut

Blade Cutting

Laser cut from sheet, or forged from billet for premium tier.

04 / Grind

Bevel Grinding

CNC blade grinding on 6 lines. ±0.05 mm tolerance, ±0.1° on edge bevel.

05 / Treat

Heat Treatment

Vacuum hardening + sub-zero cryo. HRC tested every batch.

06 / Polish

Surface Finish

Mirror polish, hand-rubbed satin, brushed stonewash. Per SKU spec.

07 / Edge

Sharpening

Hand-finished to BESS 150-200. Verified pre-pack.

08 / Assemble

Handle & Fit

Scales pinned or screwed, blade-handle alignment QC, lock function tested (folders).

09 / Engrave

Branding

Fiber laser logo on blade and bolster. Pad print on handle if applicable.

10 / QC

Final Inspection

AQL 2.5 visual, dimensional, edge, packaging.

11 / Pack

Packaging

Insert, box, sleeve, ribbon, hangtag. Packed at our facility.

12 / Ship

Export

Carton, master carton, FOB or DDP. Export docs, CO, CE / FDA declarations.

Production timeline

From PO to your warehouse:
how the 50 days break down.

PhaseCalendar DaysActivity
Sample sign-off → PO3-5Final spec lock, contract, deposit invoice
Material prep5-7Steel, handle, packaging, hardware procurement
Blade production15-20Cut, grind, heat-treat, polish, edge
Assembly5-7Handle fit, lock function, engrave
QC + rework3-5AQL 2.5 inspection, rework if needed
Packaging5-8Insert, box, sleeve, hangtag, master carton
Export prep2-3Docs, customs, freight booking
Total38-55Confirmed at PO; updates mid-production
Want to see it live

Visit during production.
Watch your order get built.

Customers welcome to visit during their PO production window. We coordinate the visit timing.